< img src="https://top-fwz1.mail.ru/counter?id=3781342;js=na" style="position:absolute;left:-9999px;" alt="Top.Mail.Ru" />

Sherman Oaks, Los Angeles, California: Wildfire-Zone Windows and Doors

Wildfire resistant windows and thermal break sliding doors for Southern California:

solar heat gain, wide temperature swing and wildfire-zone glazing.

Location
Sherman Oaks,
Los Angeles, California
Scope
Multi-panel sliding doors,
fixed lights and a hinged
entrance door
Systems used
TY120 thermal break sliding
TY150 thermal break sliding
PRO110 casement and fixed
Glazing
Tempered insulated glass
throughout

Local Climate

Southern California, San Fernando Valley. Hot dry summers with strong year-round sun, mild wet winters, and a wide day-to-night temperature swing. Hillside sites fall within the state’s wildfire hazard zones, so the glazing has to meet wildfire-zone requirements. No hurricanes.

Key Challenges

Solar heat gain through large west and south-facing glazing. California Energy Code limits on U-factor and SHGC. Tempered glazing required in wildfire hazard zones for every exterior opening. Long sliding spans that still have to run smoothly and seal.

EMD Solution

Low-E thermal break aluminum to hold down solar heat gain. Tempered insulated glazing units throughout, as required for wildfire-zone openings. Multi-panel sliding systems set out for the openings on this house.

Final Result

Multi-panel sliding doors, corner glazing, full-height fixed lights and a hinged entrance door,
installed across the house and the pool terrace.

Two-storey house with large sliding doors facing the garden
Completed residence, garden elevation

Product Specifications

EMD TY120 aluminium door profile - Botolan project specifications

TY120 Thermal Break
Sliding Doors

Profile Wall Thickness2.0mm
Frame Width120mm
Opening OptionsPush-And-Pull
Glass Configuration5mm+20A+5mm Tempered Insulated Glass
Hardware SystemEMD System

Typical Performance

Wind load resistance1,600 Pa, EN 12210 Class C4
Water tightnessClass 6A, 250 Pa, EN 12208
Air permeabilityClass 3, EN 12207
Max sash size1,500 × 2,700 mm, up to 150 kg per panel
FinishPowder coating to AAMA 2603
PVDF to AAMA 2605 for coastal exposure
profile-ty150.png Typical Performance EMD TY150 aluminium door profile - Kundasang Resort specifications drawings-plan.jpg Drawings Kundasang Resort aluminium windows installation plan drawings - EMD

TY150 Thermal Break
Sliding Doors

Profile Wall Thickness2.0mm
Frame Width150mm
Opening OptionsPush-And-Pull
Glass Configuration5mm+27A+5mm Tempered Insulated Glass
Hardware SystemEMD System

Typical Performance

Wind load resistance1,800 Pa, EN 12210 Class C4
Water tightnessClass 7A, 300 Pa, EN 12208
Air permeabilityClass 3, EN 12207
Max sash size1,800 × 2,800 mm, up to 200 kg per panel
FinishPowder coating to AAMA 2603

Specifying for a California project?

Send us your opening schedule or drawings. We return a California project window quote within 24 hours, with NFRC data for the configurations you need.

Drawings

Window shop drawings for every opening, set out on a numbered opening schedule that matches the architect’s plans. Drawings cover elevations, sections and installation details. Production starts only after the client signs off on the drawings.

Shop drawings, opening schedule and floor plan
Architect’s rendering of the completed residence

Production & QC

Window quality control inspection runs at four points on every unit before packing, and the photos are sent to the client during production.

Glazed units racked and labelled by opening reference
Frames squared and checked before glazing
Sliding door frames stacked after assembly
Assembly bay at the EMD factory

Packing & Shipping

Every unit is crated for export on timber pallets with edge protection and film wrap, then loaded into containers at the factory.

Timber crates loaded for transport
Glass units on A-frame racks, film-wrapped
Racked units staged in the yard
Crates loaded for the port

Installation

EMD technicians attended site to provide window installation supervision, working alongside the client’s local crew.

Fixed light set into the opening from inside
Double-height glazing installed from the scaffold
Sliding door leaf moved to the opening, protective film retained
Sliding door track and frame set before glazing
Send your window project brief

EMD uses the information you provide to respond to your enquiry about our products and services. You can unsubscribe at any time. For more, see our Privacy Policy.

We reply within 24 hours · WhatsApp 7 days a week · No commitment required

Scroll to Top